9, electrical control system1, general requirementsa, electrical control of centralized control by way of partition, which is based pre-treatment, painting, hanging chain, electrophoresis and control cabinet after washing, drying and curing control cabinet.b, distribution: a distribution by the user is responsible for the secondary distribution by the supplier is responsible.c, electrophoretic control cabinet with all the electrical appliances on / off switch, the working status indicator.d, the system alarm: When the device during operation, once the abnormal condition, alarm system automatically starts and the form of audio prompts field staff which sets an equipment failure and lead to exclusion.e, all operating positions with tight stop button, and ensure that in case of emergency, the emergency stop line of work, to prevent major accidents occur.f, other countries did not state Department meet the latest standards.2, the specific way of implementing the control cabineta, electrophoresis, and after the flushing control cabinet: Electrophoresis silicon rectifier input voltage 380V, 50Hz three-phase. Rectifier output voltage: DC 0-250V, current adjustable DC 0-250A.b, hanging chain conveyor system, and Spray control cabinet: power lines and control lines separately from the installation, all the operator position with stop / start button, hanging chain, designed to run alarm bells across the board.c, control cabinet drying: the temperature of each control point (such as oven temperature) of the temperature measurement and control functions, oven temperature control precision was ± 5 ℃. Motor load and temperature gauge, etc. had trouble with sound, light alarm, and can find fault processing.3, the reliability measures1), the use of advanced technology in design.2), focusing on temperature and amount of temperature measurement point probe using the backup volume.3), a full set of equipment, electrical components used internally designated product manufacturers.12, painting line installation inspection requirements related to(1), the former treatment plant1. Appearance: structure consistent with a crisp, look no mechanical bumps, the whole surface smooth, uniform color.2. Performance: A. processing parameters required to meet the equipment, advanced technology, reasonable structure, easy maintenance, emissions up to the national standard.B. The spray pump, filtration devices running stable.C. The chamber body, tank, piping and equipment for all systems without leakage.D. Equipment Operation Noise ≤ 85dB.(2), drying oven1. Appearance: smooth surface, uniform color.2. Performance: A. device parameters to meet the requirements.B. adjustable temperature control, automatic constant.C. drying the workpiece, the temperature is not more than ± 5 ℃.D. heating system uses natural gas heating.E. insulation using bulk density 100Kg/m3 quality rock wool, insulation thickness of 150mm.(3) paint spray system1. Appearance: reasonable structure, tight beat, the whole formation, no mechanical bumps, color uniform.2. Performance: A. device parameters to meet the requirements.B. mist treatment system is stable.C. equipment run Noise ≤ 85dB.(4) leveling Room1. Appearance: reasonable structure, compact, overall smooth, no mechanical bumps, color uniform.2. Performance: A. device parameters to meet the requirements.B. top of the device with emission.(5) Cathode electrophoresis system1. Appearance: reasonable structure, compact, overall smooth, no mechanical bumps, color uniform.2. Performance: A. device parameters to meet the requirements.B. superior performance electrophoretic paint equipment, coating thickness.C. equipment run Noise ≤ 85dB.(6) hanging conveyor1. Appearance: standard XT100 type, appearance, color and follow the regulations.2. Performance: A. Run to meet the technological requirements, speed range 0.5-2.5m/min, to meet the production line speed.B. catenary run smoothly, without any crawling chattering.(7) electrical control systemAcceptance and implementation details of specific projects, in accordance with the electrical control system design requirements.(8) Acceptance of the coating line industry and business-related reference standards, the final meet customer requirements.14, coating line technical service and after-sales service content and measures (limited to domestic)1, B Party is responsible for providing instructions and the related software information.2, the product warranty period of one year, during the warranty period, the product components, such as quality problems, unless Party A human responsibility, Party B is responsible for repairing.3, regular visits to customers to help them solve equipment related issues.4, B to the equipment provided technical guidance services.5, B as user training posts coating line operator, so that trainers can grasp the operation, adjustment and exclusion of the basic fault capacity. |