翻译成中文-Scope

[复制链接]
查看11 | 回复1 | 2010-5-28 14:22:36 | 显示全部楼层 |阅读模式
These Bidding Documents for Public Procurement of Works through (EPC/Turn Key) contracts have been prepared for the procurement of works through General Competitive Bidding (GCB) for projects of the industrial type or aims to the transfer of Know-How. The Contractor obligation will be for the preparation of conceptual design, the detail design, the manufacturing of the plants and equipment, the supply, construction, installation, commissioning, training, acceptance by the Employer, and maintenance of the Works, as single responsibility. Such contracts might include after taking – over responsibilities (e.g. Operation supply of raw material or spare parts, or supervision on the operation of the project...etc).

回复

使用道具 举报

千问 | 2010-5-28 14:22:36 | 显示全部楼层
本招标文件的公共采购工作通过(EPC /转键)合同已经准备好了采购工作通过一般的竞价(GCB)对项目的工业类型或试图转移的诀窍。承包商义务将用于制备的概念设计、详细设计、制造工厂和设备,供应、施工、安装、调试、培训、验收由用人单位和维护工作,为单一的责任。这样的合同结束后会有责任(换句话说,。操作提供原材料、零件或监督法律的实施项目…等等)
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

主题

0

回帖

4882万

积分

论坛元老

Rank: 8Rank: 8

积分
48824836
热门排行