帮忙翻译

[复制链接]
查看11 | 回复1 | 2010-11-6 17:36:29 | 显示全部楼层 |阅读模式
Ice cube tray and grid assembly shall be obtained from each shipment and shall be tested by
filling with clear water and placed in a refrigerated area for freezing. After freezing, the ice
cubes are to be shucked from the tray, and the entire assembly shall be thoroughly inspected.
The shucking mechanism shall function properly and there shall be no signs of failure. Grid
shall not become misaligned or bent

回复

使用道具 举报

千问 | 2010-11-6 17:36:29 | 显示全部楼层
冰块托盘和网格总成应该得到,每批货物应试验用清水充,被置于一个冷冻区域的冻结。冷冻后冰棒,立方体是剥去从碟子里弄出来的时候,整个总成应该彻底检查。正常运行机制、升运管,不得有失败的征兆。网格不成为偏差或者弯曲了
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

主题

0

回帖

4882万

积分

论坛元老

Rank: 8Rank: 8

积分
48824836
热门排行