We confirmed about the place of the equipment's installation pit and the dimension of run-material ora with A company as shown in the vicinity. For above, please give your company's confirmation. The main changes as follow:1.the place of installation pit move from left 400mm to 6210mm2.the dimension of run-material ora i
Regarding the Location of the hangequipment installation and the size of the feeding location,we confirmation the results with Cmopany A asshown in the vicinity.Please check th
1. As for the location of the equipment installation pit and the size of the feeding hole, we have made confirmation with Company A, with the results indicated nearby. Please verif
在下英语专业大一学生,自己翻译的,不知道行不行。Company A and us have already come to an agreement about tne locations of the equipment's holes showed in the paper.Your company have confirmed it.The mai
As to dimensions of equipment installation hole and feeding portal,results that we had confirmed with A showed as attachment. Please kindly to confirm it.Main changes are following