3, cylinder body take over, accessories, polished edges and corners shall be rounded transition into the R ≥ 3mm.4, did not note a high degree of K are the angle of the welding thin wall thickness of welded parts.5, equipment, welding finished, leakage test should be carried out.6, equipment, after passing all tests, the external layer of glass fiber reinforced plastic lining.7, equipment, transport packaging according to JB2536-80 <<Pressure Vessels paints, packaging, transport "" implementation.8, level gauge U using ball-type magnetic flip Shanghai Yuan Wang Level Meter (with Remote). |